Client: Jones Bros (Ruthin)
This pedestrian/ cycle bridge has a main span of 30M with 2 No adjoining approach ramps to each side. There are two main span landings and two intermediate approach ramp landings. The weight of the main span was 25 tonnes and got lifted into place on a night time railway possession with an 800 Tonne mobile crane. The total weight of the complete structure is 94 Tonnes and all fabrication work was carried in accordance with BS EN 1090-1-2 & Appendix 18/1.