Project Description

Client: Lindner Facades

R & R Engineering Ltd were appointed by Lindner Facades to Detail, Supply, Manufacture, Treat and Install the external canopies to West & South Elevations of the building referenced above. The west canopy was unique in that all of the sections used in

its construction were machined solid plate or laser welded hollow sections with sharp corners. The structure was fully welded and where possible weld caps were polished off and no fixings were left visible. To the top of the canopy was a purpose made travelling cleaning gantry which enabled full access to the top face of the glass. The complete canopy weighed in excess of 45 Tonnes and was erected on site within an 8 week period.